Surveying·MCQ explained

A survey line provided to verify the accuracy of the framework is known as?

Try it first: pick an option, then read the explanation.

Correct answer: D. Check line
Home >MCQ >Surveying MCQs >MCQs on Chain Surveying (5)

Understanding the Survey Framework

The fundamental principle of chain surveying is triangulation. The area to be surveyed is divided into a network of triangles, which forms a rigid framework. The accuracy of the entire survey depends on the accuracy of this framework. Various types of survey lines are used to build and verify this structure.

Analysis of Survey Lines

Each type of survey line has a distinct purpose:

  • Base Line: This is the longest and most important line in the survey. It forms the foundation of the entire framework and is measured with the highest possible precision.
  • Tie Line: This line joins two fixed points (tie stations) on the main survey lines. Its primary purpose is to help locate interior details of the area and to avoid long, inaccurate offsets.
  • Check Line (or Proof Line): This line is measured on the ground after the main framework is complete. Its sole purpose is to verify the accuracy of the plotted work. The measured length of the check line on the ground must match its scaled length on the map. If they match, the framework is accurate.

Therefore, the line used specifically to verify accuracy is the check line.

Visualizing the Framework

In a typical survey framework, the base line forms the main spine, tie lines help capture details, and check lines cut across the triangles to prove the accuracy of the plot.

Diagram showing different survey lines

Summary of Survey Lines

Line TypePrimary PurposeKey Characteristic
Base LineFoundationLongest line, measured with highest accuracy.
Tie LineLocating DetailsJoins main lines to avoid long offsets.
Check LineVerification / ProofGround measurement is compared to map measurement.
Home >MCQ >Surveying MCQs >MCQs on Chain Surveying (5)