Surveying·MCQ explained

Cross-staff is used for:

Try it first: pick an option, then read the explanation.

Correct answer: A. Setting out right angles
Home >MCQ >Surveying MCQs >MCQs on Chain Surveying (5)

The Role of the Cross-Staff

Chain surveying is fundamentally based on making linear measurements only. To locate details and features that are not directly on the main survey lines, a method called "offsetting" is used. This requires establishing lines that are exactly perpendicular (at a 90° angle) to the chain line. The cross-staff is a simple, essential instrument designed specifically for this purpose.

Detailed Analysis of Options

  • A. Setting out right angles: This is the correct answer. The primary and intended function of a cross-staff is to allow a surveyor to accurately sight and establish a line at a 90° angle to an existing chain line.
  • B. Measuring horizontal angles: This is incorrect. A cross-staff cannot measure an unknown angle. Its design is fixed to set out a specific angle (90°). Instruments like a theodolite or compass are used for measuring various horizontal angles.
  • C. Both (a) and (b): This is incorrect because a cross-staff cannot perform the function described in option (b).

Comparison of Angle-Setting Instruments

Different types of cross-staffs and related instruments are used for setting out specific angles:

InstrumentPrimary Use (Angles Set Out)Notes
Open Cross-Staff90°The simplest form, with two pairs of vertical slits at 90° to each other.
French Cross-Staff45° and 90°An octagonal box that allows setting out 45° angles as well.
Adjustable Cross-StaffAny angleMore complex, with a rotating top cylinder, but less common.
Optical Square90°A more precise instrument that uses mirrors or prisms. Works on the principle of double reflection.

Key Takeaway

The key distinction in surveying is between measuring an angle and setting out a known angle. A cross-staff is a tool for setting out a right angle, which is a fundamental operation in chain surveying. It does not measure unknown angles.

Home >MCQ >Surveying MCQs >MCQs on Chain Surveying (5)