Addition of calcium chloride in concrete results in:
Try it first: pick an option, then read the explanation.
Correct answer: B. Reduction in curing period
Detailed Explanation: CaCl2 Reduces Curing Period by Accelerating Hardening
Why B (Reduction in curing period) is correct: Calcium chloride (CaCl2) is an accelerating admixture. It speeds up cement hydration, so concrete gains strength faster. Because strength is achieved sooner, the required curing period (the time concrete must be kept moist and protected to achieve its design strength) is reduced. Concrete can be put into service earlier, and formwork can be removed sooner.
Effects of CaCl2 on Concrete
Effect
Correct?
Explanation
A. Increased ultimate strength
✗ No
CaCl2 accelerates early strength but does not significantly increase the ultimate 28-day/90-day strength; may slightly reduce it at high doses
B. Reduction in curing period
✓ Yes
Faster hydration = faster strength gain = shorter time to reach minimum required strength = reduced curing period
C. Retardation of moisture loss
✗ No
CaCl2 accelerates hydration which consumes water faster; it does not retard moisture loss — that is the function of a curing compound
D. All of these
✗ No
Only B is correct; A and C are wrong
CaCl2: How It Works
Mechanism
Detail
Accelerates C3S hydration
Ca2+ and Cl¹¯ ions increase the ionic strength of pore solution; accelerates dissolution of C3S and C3A
Increases rate of C-S-H formation
Faster gel formation; earlier strength gain
Reduces initial setting time
From ≈45–60 min (without) to ≈20–30 min (with 2% CaCl2)
Practical Applications of CaCl2
Application
Benefit
Cold weather concreting
Concrete gains strength before frost can damage it
Emergency repairs
Road/bridge repairs can be opened to traffic sooner
Precast concrete
Earlier demoulding; faster production cycle
Winter construction
Reduces heating requirements; concrete self-heats from accelerated hydration