Engineering Materials·MCQ explained

Addition of calcium chloride in concrete results in:

Try it first: pick an option, then read the explanation.

Correct answer: B. Reduction in curing period

Detailed Explanation: CaCl2 Reduces Curing Period by Accelerating Hardening

Why B (Reduction in curing period) is correct: Calcium chloride (CaCl2) is an accelerating admixture. It speeds up cement hydration, so concrete gains strength faster. Because strength is achieved sooner, the required curing period (the time concrete must be kept moist and protected to achieve its design strength) is reduced. Concrete can be put into service earlier, and formwork can be removed sooner.

Effects of CaCl2 on Concrete

EffectCorrect?Explanation
A. Increased ultimate strength✗ NoCaCl2 accelerates early strength but does not significantly increase the ultimate 28-day/90-day strength; may slightly reduce it at high doses
B. Reduction in curing period✓ YesFaster hydration = faster strength gain = shorter time to reach minimum required strength = reduced curing period
C. Retardation of moisture loss✗ NoCaCl2 accelerates hydration which consumes water faster; it does not retard moisture loss — that is the function of a curing compound
D. All of these✗ NoOnly B is correct; A and C are wrong

CaCl2: How It Works

MechanismDetail
Accelerates C3S hydrationCa2+ and Cl¹¯ ions increase the ionic strength of pore solution; accelerates dissolution of C3S and C3A
Increases rate of C-S-H formationFaster gel formation; earlier strength gain
Reduces initial setting timeFrom ≈45–60 min (without) to ≈20–30 min (with 2% CaCl2)

Practical Applications of CaCl2

ApplicationBenefit
Cold weather concretingConcrete gains strength before frost can damage it
Emergency repairsRoad/bridge repairs can be opened to traffic sooner
Precast concreteEarlier demoulding; faster production cycle
Winter constructionReduces heating requirements; concrete self-heats from accelerated hydration
  • CaCl2 → accelerated hydration → reduced curing period (concrete achieves required strength sooner).
  • Safe limit: 2% by wt. of cement (limited by IS 456 chloride content rules).
  • Banned in pre-stressed concrete; limited in reinforced concrete due to corrosion risk.