Engineering Materials·MCQ explained

What is the interval at which expansion and contraction joints are provided for a smooth foundation interface laid in winter in India?

Try it first: pick an option, then read the explanation.

Correct answer: B. 50 to 60 metres

Detailed Explanation: Expansion/Contraction Joints at 50–60 m in Winter, Smooth Interface

Why B (50 to 60 metres) is correct: IRC (Indian Roads Congress) specifications for cement concrete pavements prescribe joint intervals based on season of construction and slab thickness. When concrete is laid in winter (October to March) over a smooth foundation interface (lower friction), the contraction/expansion joint spacing is 50 m for 15 cm and 20 cm slabs, and 60 m for 25 cm slabs. Hence the range is 50 to 60 metres.

Joint Spacing for CC Pavements (IRC Specifications)

Season of LayingFoundation InterfaceSlab Thickness (cm)Joint Interval (m)
Winter (Oct–Mar)Smooth1550
2050
2560
Winter (Oct–Mar)Rough1540
2040
2550
Summer (Apr–Sep)Smooth1590
2090
25120
Summer (Apr–Sep)Rough1575
2075
2590

Why Season and Interface Type Affect Joint Spacing

FactorEffect on Spacing
Winter layingConcrete placed at low temperature; will expand significantly in summer; joints closer to handle larger expansion range → smaller spacing
Summer layingConcrete placed near maximum temperature; will contract in winter; less expansion expected → larger spacing
Smooth interface (polythene sheet)Lower friction; slab can slide more freely; joints can be slightly further apart
Rough interface (granular sub-base)Higher friction; slab is more restrained; joints needed closer together
Thermal Expansion Estimate: ΔL = α × L × ΔT Where: α = 10 × 10&sup-;&sup6; /°C (concrete), L = slab length, ΔT = temperature rise For L = 50 m, ΔT = 30°C: ΔL = 10 × 10&sup-;&sup6; × 50 × 30 = 0.015 m = 15 mm Expansion joints must accommodate this 15 mm movement.
  • Smooth interface + winter laying = 50 m (15 & 20 cm slab) and 60 m (25 cm slab) → range 50–60 m.
  • Summer + smooth = 90–120 m; summer + rough = 75–90 m; winter + rough = 40–50 m.
  • Joint spacing accounts for concrete placed cold in winter expanding greatly in summer heat.