The value of Vee-Bee time for low workability as per Indian standards is prescribed as

The value of Vee-Bee time for low workability as per Indian standards is prescribed as

A. 2-5 seconds
B. 5-10 seconds
C. 20 seconds
D. 20-30 seconds
Correct Answer: B. 5-10 seconds

📚 Detailed Explanation: Vee-Bee Time for Low Workability

Why B (5–10 seconds) is correct: The Vee-Bee consistometer test (IS 1199) measures the time (in seconds) for concrete to completely remould under standard vibration. Classifications:
• >20 s: Very low workability
10–20 s: Very stiff / Very low
5–10 s: Low workability (answer for this question)
• 3–5 s: Medium workability
• 0–3 s: High workability
Option A (2–5 s) = medium. Option C (20 s single point) = very low boundary. Option D (20–30 s) = extremely stiff.

Vee-Bee Time Classification

Vee-Bee Time (s) Workability
>20 Very low
10–20 Very stiff / low
5–10 Low
3–5 Medium
0–3 High
  • Low workability Vee-Bee time = 5–10 seconds per IS 1199.
  • Vee-Bee is preferred for stiff, dry mixes unsuitable for slump measurement.

← Back to MCQs on Workability of Concrete

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top