MCQs on Cement
Q156. As the cement sets and hardens, it generates heat. This is called: Heat of hydration Latent heat Heat of
MCQs on Cement
Q146. The proper size of cube mould for testing compressive strength of cement is: 7.05 cm 10.05 cm 10 cm
MCQs on Cement
Q136. For massive dam construction, _______ is used. Rapid hardening cement Blast-furnace slag cement Ordinary Portland cement Low heat cement
MCQs on Cement
Q121. To retard the initial setting time of cement, the compound responsible is Tri-Calcium silicate Gypsum Di-calcium silicate Tri calcium
MCQs on Cement
Q101. Gypsum is added to cement in small quantity to: control final setting time make cement hydrophobic give colour to
MCQs on Cement
Q81. The cement compound that reacts and sets immediately after addition of water is: C2S C3A C3S C4AF Correct Answer:
MCQs on Cement
Q61. For under-water construction or construction in running water, which type of cement is most suitable? Expansive cement Ordinary Portland
MCQs on Cement
Q41. Which type of cement is produced by grinding clinkers formed by calcining bauxite, lime, iron oxide with a little
MCQs on Cement
Q21. Identify the correct pair(s) from the following based on the types of cement and their respective IS specifications. 1.