During the alignment of a road by using direct ranging, the surveyor raises both the hands above his head and then, brings them down as a signal for his assistant. The correct action taken by his assistant would be _______.
Try it first: pick an option, then read the explanation.
Detailed Explanation: Understanding Ranging Signals in Surveying
Direct Ranging is a fundamental surveying procedure used to establish intermediate points along a straight line between two terminal points that are intervisible (visible to each other). Effective communication between the surveyor at the instrument and the assistant holding the ranging rod is crucial for accuracy. This is achieved through a standardized set of hand signals.
Analysis of the Signal
The signal described in the question — the surveyor raising both hands above the head and then bringing them down — is the universally accepted signal for "Correct" or "In Line." It indicates that the assistant has positioned the ranging rod perfectly on the survey line. Upon seeing this signal, the assistant's job is to understand that the position is correct and wait for the next instruction, which is typically to fix the rod in place.
Common Hand Signals in Ranging
Here is a comprehensive table of standard hand signals used during ranging operations:
| Signal by the Surveyor | Action by the Assistant |
|---|---|
| Rapid sweep with right hand | Move considerably to the right |
| Slow sweep with right hand | Move slowly to the right |
| Right arm extended | Continue to move to the right |
| Right arm up and moved to the right | Plumb the rod to the right |
| Rapid sweep with left hand | Move considerably to the left |
| Slow sweep with left hand | Move slowly to the left |
| Left arm extended | Continue to move to the left |
| Left arm up and moved to the left | Plumb the rod to the left |
| Both hands above head and then brought down | Correct |
| Both arms extended forward horizontally and hands depressed briskly | Fix the rod |
Key Concepts for Students
- Clarity in Communication: Standardized hand signals eliminate ambiguity and ensure precision in surveying, especially over long distances where shouting is impractical.
- Importance of Plumbness: Note the specific signals for "Plumb the rod." A ranging rod that is not held perfectly vertical will introduce errors in the alignment. The surveyor checks for verticality after getting the rod on the line.
- Efficiency: Knowing these signals allows the survey team to work quickly and efficiently, saving time and reducing the potential for errors. The process involves getting the rod approximately on line with wide sweeps, making finer adjustments with slow sweeps, checking for plumbness, and finally confirming the correct position.