Browse

MCQ explained

MCQ explainedWhat is the function of the plumbing fork in plane table surveying?Surveying · 2 min read
MCQ explainedWhat is the purpose of conducting the resection method in plane table surveying?Surveying · 2 min read
MCQ explainedWhich of the following represents the correct order of setting up a plane table?Surveying · 2 min read
MCQ explainedThe principle of plane table survey is:Surveying · 2 min read
MCQ explainedIn setting up a plane table at station A, the point on the plan was NOT accurately centred. If displacement of…Surveying · 2 min read
MCQ explainedWhich of the following is a disadvantage of plane table survey?Surveying · 2 min read
MCQ explainedWhen only one point is available for orientation, orientation is done by:Surveying · 2 min read
MCQ explainedWith respect to plane table surveying, the terms triangle of error, great circle, and great triangle are relat…Surveying · 2 min read
MCQ explainedMethod 1: Point O is plotted by measuring only distances MO and NO. Method 2: Point O is plotted by measuring…Surveying · 2 min read
MCQ explainedIn plane table surveys, the orientation of the table only by back-sighting is preferred when:Surveying · 2 min read
MCQ explainedIn plane table surveying, Lehmann’s rules are associated with:Surveying · 2 min read
MCQ explainedIn regard to the resection method of plane table survey, the term resector refers to the:Surveying · 2 min read
MCQ explainedIf d is the constant distance between the sections, then the correct prismoidal formula for volume is:Surveying · 2 min read
MCQ explainedVolume by the Trapezoidal Formula Method is determined by the formula:Surveying · 2 min read
MCQ explainedThe assumption on which the trapezoidal formula for volumes is based, is:MCQ Explained · 2 min read
MCQ explainedIn the mid-section formula:Surveying · 2 min read
MCQ explainedWhich of the following methods estimates the best volume of earthwork of an irregular embankment?Surveying · 2 min read
MCQ explainedAreas included by contour lines for a proposed dam: 410m=205ha, 420m=120ha, 430m=145ha, 440m=95ha, 450m=135ha.…Surveying · 2 min read