Identify the INCORRECT statement regarding ready-mix concrete (RMC). Consider that ordinary Portland cement is used for making RMC.

Identify the INCORRECT statement regarding ready-mix concrete (RMC) made with ordinary Portland cement:

A. Ready-mix concrete packed in bags should be added with a hydration activator while mixing with water
B. The mix design of RMC is tailor made to suit the placing methods of the contractor
C. Ready-mix concrete increases the speed of construction
D. Ready-mix concrete in wet condition is transported by using a transit mixer from the batching plant to the construction site
Correct Answer: A. RMC in bags needs hydration activator

📚 Detailed Explanation: Ready-Mix Concrete — No Hydration Activator Needed

Why A is INCORRECT: OPC (Ordinary Portland Cement) begins hydrating immediately upon contact with water through a spontaneous exothermic chemical reaction. No activator is needed or used. The idea of requiring a “hydration activator” applies only to specialty systems like alkali-activated cements (geopolymers), slag-based cements, or inhibited cement systems — not to standard OPC-based RMC.

Ready-Mix Concrete (RMC) — Key Facts

Feature Detail
Production Batched at central plant; mixed in transit mixer or dry-batched and mixed on site
Transport Transit mixer (drum rotates at slow agitation speed, 2–4 rpm) during transport
Delivery time Must be discharged within 90 minutes of adding water (IS 4926) or 300 drum revolutions
Advantages Consistent quality, speed of construction, eliminates on-site batching errors

Checking All Statements

Statement Verdict
A. RMC bags need hydration activator INCORRECT — OPC activates on contact with water, no activator needed
B. Mix design is tailor-made for contractor Correct — RMC is customised to specific grade, slump, aggregate size
C. RMC increases construction speed Correct — eliminates on-site batching time
D. Wet RMC transported by transit mixer Correct — transit mixer is the standard delivery vehicle
  • OPC-based RMC does NOT require a hydration activator — statement A is the incorrect one.
  • RMC must be placed within 90 minutes of water addition per IS 4926.

← Back to MCQs on Proportioning of Concrete Mixes