Discipline

Surveying MCQs

Surveying MCQs with detailed answers on chain surveying, compass surveying, plane tabling, and levelling. Civil engineering exam preparation resource.

MCQ explainedWhich statement is correct for proper adjustment of the theodolite (line of collimation)?Surveying · 2 min read
MCQ explainedWhich instrument is used for centering the theodolite in windy conditions?Surveying · 2 min read
MCQ explainedRelative error of the closure is the ratio of:Surveying · 2 min read
MCQ explainedCalculate the additive and multiplying constant given focal length, stadia intercept, and axis-to-objective di…Surveying · 2 min read
MCQ explainedIn which plane is the telescope of the theodolite turned in order to swing?Surveying · 2 min read
MCQ explainedCalculate the distance between the instrument and the staff given three staff readings, K=100, C=10.Surveying · 2 min read
MCQ explainedCalculate the intersect angle (degree) for the anallactic telescope.Surveying · 1 min read
MCQ explainedThe least count of a theodolite is (vernier transit theodolite):Surveying · 2 min read
MCQ explainedThe process of turning the telescope in vertical plane through 180 degrees about the trunnion axis is called:Surveying · 2 min read
MCQ explainedIf sum of north latitudes exceeds south latitudes and sum of west departures exceeds east departures, the bear…Surveying · 2 min read
MCQ explainedWhile using a theodolite, how to change the reading on the horizontal circle while measuring a horizontal angl…Surveying · 2 min read
MCQ explainedWhich type of error is represented by a closed traverse if the algebraic sum of latitude of all lines is zero?Surveying · 2 min read
MCQ explainedSelect the incorrect statement regarding total stations.Surveying · 2 min read
MCQ explainedA smart station is used to indicate:Surveying · 2 min read
MCQ explainedWhich of the following actions is NOT a permanent adjustment in case of transit theodolite?Surveying · 2 min read
MCQ explainedBowditch rule is also termed as:Surveying · 2 min read
MCQ explainedCategorize total station survey errors as due to temporary (T) or permanent (P) adjustments.Surveying · 2 min read
MCQ explainedIf the latitude and departure of a line AB are 40 m and 30 m respectively, estimate the length of line AB.Surveying · 1 min read